Production decision guide

Filling machine cost guide

Learn what affects filling machine price for liquids, pastes, powders and granules, from dosing technology to cleaning and automation.

Production environment relevant to filling machine cost guide

In brief

Learn what affects filling machine price for liquids, pastes, powders and granules, from dosing technology to cleaning and automation. Use a written requirement and compare the complete installed operating scope, not a headline specification or purchase price in isolation.

The dosing principle sets the foundation

Gravity, pump, piston, peristaltic, auger, weigh and level-filling systems solve different product and accuracy requirements. The cheapest principle is not economical if it cannot control the real product.

Product behaviour changes the design

Viscosity, temperature, foam, particles, aeration, corrosiveness, dust and hazardous classification affect wetted parts, valves, pumps, hoppers, extraction and controls.

Container handling adds scope

Manual presentation can suit low output. Automatic lines need spacing, indexing, no-container/no-fill controls, conveyors and change parts for every qualified container.

Accuracy has a cost and a value

Define tolerance in a measurable unit and calculate product giveaway. Better repeatability can justify investment when the product is high value or quantity control is tight.

Information to prepare

  • Product formulation and behaviour
  • Dose range and tolerance
  • Container dimensions and opening
  • Good packs per minute
  • Product-contact materials
  • Cleaning and changeover
  • Sample trial and acceptance plan
Relevant specialist route

Filling Machines UK

Filling-machine selection by product, pack and production rate.

View the solutionfillingmachinesuk.co.uk
Application review: Costs, performance and suitability depend on the actual product, pack, output, site and acceptance criteria.
Project questions

Questions customers also ask

What information is needed for filling machine cost guide?

Start with the product, pack range, sustained good output, quality limits, utilities, cleaning, changeover, layout and acceptance method.

How should suppliers be compared?

Use one written requirement and ask each supplier to state compliance, exclusions, installed scope, evidence and lifecycle assumptions.

Why is purchase price not the complete cost?

Delivery, installation, tooling, integration, labour, materials, downtime, maintenance and support affect total cost after purchase.

When should samples be tested?

Test before design is frozen, using representative normal and difficult samples and a written acceptance plan.

Ask a question