How to use this template
Commissioning should prove utilities, safety functions, machine interfaces, product flow, recipes, quality checks, changeovers, cleaning, documentation and operator competence. Record open actions and release authority rather than treating first movement as completion.
Packaging line commissioning checklist
Use this sheet to record readiness and evidence before the line is released into normal production.
Site / line: __________________________
Product / format: __________________________
Date / shift: __________________________
Completed by: __________________________
| No. | Check | Result / value | Action / initials |
|---|---|---|---|
| 1 | Verify approved layout and access | ||
| 2 | Confirm electrical supply and isolation | ||
| 3 | Confirm compressed air and utilities | ||
| 4 | Inspect guarding and safety devices | ||
| 5 | Test emergency stops and reset sequence | ||
| 6 | Verify upstream/downstream handshakes | ||
| 7 | Load approved recipes and limits | ||
| 8 | Run dry cycle and product trials | ||
| 9 | Verify inspection and reject systems | ||
| 10 | Complete format changeover | ||
| 11 | Complete cleaning and line clearance | ||
| 12 | Confirm manuals, spares and drawings | ||
| 13 | Train operators and maintenance | ||
| 14 | Record performance test | ||
| 15 | Close or assign outstanding actions |
Overall result / release decision: __________________________________________________________________________________
Comments: __________________________________________________________________________________________________