How do I measure ATEX and hazardous areas accurately?
Practical guidance for ATEX and hazardous areas: separate true machine speed from waiting, handling, replenishment and short stops.
Direct answer
For ATEX and hazardous areas, measure sustained good output over a representative run rather than relying on the machine’s maximum cycle rate. Improvement starts with a clear definition, measured baseline and an agreed result that can be tested after the change. Start by count good packs over at least one representative production period and record a defined before-and-after metric supported by production records. Make one controlled change at a time so the original cause is not hidden by several new settings.
ATEX Filling Machines
See the machinery and application options most closely matched to this production question.

What usually causes this?
- operators waiting to load, position or remove packs
- A change in data definition and collection or operator and maintenance method.
- the machine being starved by a small hopper, feeder or upstream process
- The equipment or handling method not being set for classification and equipment requirements where explosive atmospheres may occur.
- short stops and resets consuming more time than expected
Checks to make in order
- Count good packs over at least one representative production period
- Record a defined before-and-after metric supported by production records using a representative sample.
- Record running, starved, blocked and fault time separately
- Check product and format variation, machine condition and process capability and acceptance, risk and commercial criteria.
- Measure loading, replenishment and changeover time
- Identify the operation with the longest effective cycle
- Test one improvement and confirm the bottleneck moves
How to decide the next step
Atex and hazardous areas involves classification and equipment requirements where explosive atmospheres may occur. Increase speed only after the limiting step and the required buffer or operator method are clear.
If adjustment and maintenance cannot hold the required result across the complete product and pack range, compare the machinery route against a written acceptance test. The important comparison is sustained good output—not only maximum cycle speed.
What to include in your production brief
Supplying the information below makes it much easier to distinguish a setup problem from a machinery or packaging limitation:
- Current baseline data
- Affected products and formats
- Cost or risk of the problem
- Required future state
- Site and compliance constraints
- Acceptance test and owner
- Samples that represent atex and hazardous areas
- A short video of the current process and fault
Relevant solution websites
These specialist sites match the production process discussed above. Final suitability should be confirmed with samples, output, site and acceptance information.
Related questions
Planning and improvementHow do I improve ATEX and hazardous areas?
Practical guidance for ATEX and hazardous areas: reduce product loss, damaged packs, film waste and avoidable rejects.
Read the answer →
Planning and improvementWhat does ATEX and hazardous areas mean in packaging production?
Practical guidance for ATEX and hazardous areas: find why weights, levels, positions, torque or finished packs vary during a run.
Read the answer →
Planning and improvementWhat data should I collect for ATEX and hazardous areas?
Practical guidance for ATEX and hazardous areas: plan access, product removal, safe cleaning and verified return to production.
Read the answer →
Planning and improvementHow do I measure line speed accurately?
Practical guidance for line speed: separate true machine speed from waiting, handling, replenishment and short stops.
Read the answer →
Planning and improvementHow do I measure format changeovers accurately?
Practical guidance for format changeovers: separate true machine speed from waiting, handling, replenishment and short stops.
Read the answer →
Planning and improvementHow do I measure planned maintenance accurately?
Practical guidance for planned maintenance: separate true machine speed from waiting, handling, replenishment and short stops.
Read the answer →