What this calculator measures
The required design rate is higher than the required good-output rate because normal stops, reduced speed and rejects reduce the number of saleable packs produced.
How to use the result
- Use saleable daily demand, not gross machine cycles.
- Enter the hours genuinely available to produce the product after planned cleaning and changeover.
- Use a realistic OEE from comparable production, not an aspirational figure.
- Check every line station, buffer and manual task against the calculated design rate.
Automatic Packaging Lines
Integrated line design based on sustained good output rather than isolated machine speed.
