Changeover cost includes labour during the stop and the contribution that could have been produced. It should also track startup scrap and the time to first stable good pack.

Your result

Enter the production figures and select Calculate result.

How to use the result

  1. Time from last good pack to the first stable good pack of the next run.
  2. Separate internal work that requires a stopped line from external preparation.
  3. Record startup waste and quality adjustment time.
  4. Use the annual product mix, not one easy changeover.
Planning estimate: This tool does not create a quotation, legal quantity-control target, guaranteed OEE or investment approval. Validate the inputs against actual production.
Relevant specialist route

Packaging Lines

Integrated packaging-line projects with coordinated format change and acceptance criteria.

View the solutionpackaginglines.co.uk
Calculator questions

Questions customers also ask

What is the correct start and finish point for a changeover?

A practical definition is last good pack of the old run to the first stable good pack of the new run, including required cleaning and verification.

How can changeover time be reduced?

Prepare tools and parts externally, standardise settings, use repeatable references, improve access and remove adjustment by design.

Should cleaning be counted separately?

Record it separately for diagnosis, but include required cleaning in the total unavailable time for production planning.

Can faster changeover justify more product variants?

It can reduce the operating penalty of variety, but the commercial value and scheduling complexity should still be assessed.