What this calculator measures
Changeover cost includes labour during the stop and the contribution that could have been produced. It should also track startup scrap and the time to first stable good pack.
How to use the result
- Time from last good pack to the first stable good pack of the next run.
- Separate internal work that requires a stopped line from external preparation.
- Record startup waste and quality adjustment time.
- Use the annual product mix, not one easy changeover.
Packaging Lines
Integrated packaging-line projects with coordinated format change and acceptance criteria.
